Active-Living.org
E-Store
Become an Advocate for an Improved Highway 9

Highway 9 is slated to be widened. A final design must be adopted soon so that SCDOT can move forward with the project.

Click here for more information on the project.

Proposal Video

The proposed plan includes what is often referred to as a "complete street." This means that sidewalks, grassy buffers, bicycle lanes and planted medians with occasional turn lanes are included so that all users are accommodated. However, there have been some who have suggested pulling these amenities to save funding. These amenities, however, would be the first step in creating a pedestrian and bicycle network so that eventually community residents can walk their children to school or ride their bicycles to a park or green space. In the meantime, the sidewalks would encourage those that work along Highway 9 to make small lifestyle changes, like walking to lunch.


If the amenities are removed from the plan, the project will only be extended approximately a quarter of a mile, which is minimal.

Please consider contacting your County Council representative if you live in Boiling Springs (email addresses in attached PDF) or for those of you that are concerned citizens, a member of the SPATS Policy Committee Member, to encourage them to support a plan with wide sidewalks, bicycle lanes and planted medians.

What Highway 9 might look like:

         

864-598-9638 ~ www.active-living.org ~ Contact Us
Copyright 2003-2008 Partners for Active Living. All Rights Reserved.